Get all of the electrical systems up to modern code
Make it easy to switch from line to generator and back
Make it look nice
The Plan
Run 40' of 4" x 6" cable trays along the steel U-channel in the basement to the center of the lodge. There, join up with a new 200A Square D PON load center. Move a bunch of the loads out of the pantry load center into the basement subpanel. Then clean up that pantry wall.
Pantry
load center: 200A ____ type __
feeder:
ground:
Basement
load center: 200A
feeder: AWG 3/0 copper wire, 60' x (3) strands
ground: AWG #\8 copper ground wire, 60'
Stuff to move onto new panel
240V
(2) electric heaters
(2) electric water heaters
(1) electric water heater (small)
(1) booster pump
120V
TODO
Prereqs
move first aid room sprinkler
move first aid room night light
buy only a few combo AFCI/GFCI and verify they work well with generator
Shopping List
40' of 4x6" cable tray
180' of AWG 3/0 copper wire
60' of AWG #\8 bare copper wire
200A Square D PON Load Center
(4) 240V, 20A
(3) 240V, 30A, GE
(5) 120V, 20A AFCI/GFCI
(5) 120V, 15A AFCI/GFCI
The text was updated successfully, but these errors were encountered:
Problem
The wall of the pantry is a disaster.
Goals
The Plan
Run 40' of 4" x 6" cable trays along the steel U-channel in the basement to the center of the lodge. There, join up with a new 200A Square D PON load center. Move a bunch of the loads out of the pantry load center into the basement subpanel. Then clean up that pantry wall.
Stuff to move onto new panel
Prereqs
Shopping List
The text was updated successfully, but these errors were encountered: